Posts Tagged ‘strike’

Earth Day – Awakening an environmental citizenry

posted on April 21, 2014
"Aerial photographs during the strike" Kaiser Steel, Fontana 1972

Cover of “Aerial photographs during the strike” published by Kaiser Steel, Fontana 1972

Lincoln Cushing
Heritage writer

The first national “Earth Day” on April 22, 1970 was an indicator of increased national environmental consciousness, and community relations with the Kaiser steel mill in Fontana, Calif. had grown tense. The wartime facility had fired up its first blast furnace, “Bess No. 1” (named after Kaiser’s wife), on December 30, 1942, and boasted numerous technologies to reduce air and water pollution. Yet smog was invading the formerly pristine remote rural community, and many fingers pointed toward the mill.

In February 1972 the United Steelworkers of America Local No. 2869 started a 43-day strike that shut down the sprawling facility. Taking to heart Henry J. Kaiser’s famous proclamation that “Problems are only opportunities in work clothes,” management saw the situation as a way to help dispel the persistent criticisms. They embarked on a project to document Fontana’s skies when the “variable” of an operating steel mill was absent. An independent series of aerial photos – some with filthy air, some without – provided evidence that east-blowing Los Angeles basin smog might be the culprit.

Read the full story here.

Short link to this story: http://bit.ly/1kUnEIW

Tags: , , ,

Strikes, smog, and steel – a case study of Kaiser Fontana Steel

posted on November 25, 2013

By Lincoln Cushing, Heritage writer

Can heavy industry be a good neighbor? That was one of the challenges facing the Kaiser Steel plant in Fontana, California, in 1972.

Steel for shipbuilding and other industries was in heavy demand during World War II, and no integrated mills (those capable of all phases of steel production, from making iron through rolling shapes) existed on the West Coast.

Cover of "Aerial photographs during the strike" published by Kaiser Steel, Fontana 1972
Cover of “Aerial photographs during the strike” published by Kaiser Steel, Fontana 1972

Henry J. Kaiser was a man of action, so he built a state-of-the-art plant in then-rural Fontana, 55 miles inland from Los Angeles.  It fired up its first blast furnace, “Bess No. 1” (named after Kaiser’s wife), on December 30, 1942, and boasted numerous technologies to reduce air and water pollution.

Additional steps were taken over the years to be a model facility, but the plant struggled to adopt increasingly stringent environmental safeguards as the surrounding community developed.

The first national “Earth Day” in 1970 was an indicator of increased national environmental consciousness, and community relations with the steel mill grew tense.

In February 1972 the United Steelworkers of America Local No. 2869 started a 43-day strike that shut down the sprawling facility. Implementing Henry J. Kaiser’s famous proclamation that “Problems are only opportunities in work clothes,” management saw the situation as a way to help dispel one of their most persistent criticisms – Kaiser Steel’s perceived role as the primary source of local air pollution. They embarked on a project to document Fontana’s skies when the “variable” of an operating steel mill was absent.

Here is the explanatory text from the 32-page booklet, Aerial Photographs During the Strike, published by Kaiser Steel immediately following the work stoppage:

 
And The Smog Stayed On

Even though virtually all authorities agree that less than 15 percent of photochemical smog comes from stationary sources, it is often contended that the elimination of industrial plants in San Bernardino County would make a dramatic reduction in the area’s air pollution problem. Kaiser Steel was recently placed in the position where the results of such an action could be observed.

A strike idled the Fontana Plant beginning February 1, 1972. It brought to a halt all production from the blast furnaces, open hearths, oxygen furnaces, and rolling mills.

Sample pages from "Aerial photographs during the strike" published by Kaiser Steel, Fontana 1972. Photographs with date and time stamps, as well as notation about wind direction and speed.
Sample pages from “Aerial photographs during the strike” published by Kaiser Steel, Fontana 1972. Photographs with date and time stamps, as well as notation about wind direction and speed.

During the first three weeks of the strike, aerial photographs were taken to record atmospheric conditions in the vicinity of the Fontana Plant. Of course, this is the clearest time of the year and there were many days, and particularly mornings, of good visibility and little or no photochemical smog. On the other hand, most of the days there was a very visible bank of photochemical smog in the area, much of which appeared to be brought by afternoon winds from the west.

This booklet is a collection of pictures taken during the first three weeks of the strike. While it is not possible to make exact comparisons for any given day, it is evident that even with the steel mill shut down, the area suffered some of its worst smog for this time of year.

California author Mike Davis, in his critical book City of Quartz, noted Kaiser Steel’s strike-based environmental documentation in the chapter “Fontana: Junkyard of Dreams” and made these observations:

Many ex-steelworkers still vehemently believe that the Kaiser pollution scare was purposely manufactured by developers who regarded the plant—smog-spewing or not—as a huge negative externality to residential construction in the Cucamonga-Fontana area.

As San Bernardino County’s West End fell under the “urban shadow” of Los Angeles and Orange County, developable property values came into increasing conflict with the paycheck role of the mill as leading local employer.

Inevitably the pollution debate reflected these divergent material interests.

Short link to this article http://ow.ly/radEK

Tags: , , , , ,